| | | | | |
| | REGION 1 | | | |
| St. Andrew | Riverton Meadows ECC | Damage to section of the roof. | None available | An estimate for repairs will be requested | Support required |
| Kingston | Allman Town Basic | Water tank blown off the roof and the pipes are damaged. | No relocation or alternative venue needed | Buckets of water to be used until the piping and tank can be fixed/replaced | Support Required |
| St. Andrew | Lyndhurst ECDC | Water soaked/leaking solitex are hanging down in the classroom | They will use the clasroom that has minimal damage | Classrooms with minimal damage will be used until the damaged sections can be fixed. | Support Required |
| | REGION 2 | | | |
| Portland | Seaside Basic | Damaged Roof | None available | To be confirmed | Support Required |
| | REGION 3 | | | |
| St. Ann | Watt Town Basic | Roof damaged to a section of the building, Classrooms flooded | No alternate location yet identified | None Yet | Assistance is required for roof repairs. |
| St.Ann | Lyndale Retreat Basic | Roof Damaged | No alternate location identified | None Yet | Assistance required |
| St. Ann | Free Hill Primary and Infant | The roof to one section is leaking, damaged windows, gutters displaced and the rails on corridor destroyed. | No alternate location yet identified | None Yet | Assistance is required in all areas. |
| St. Ann | Lilyfield Basic | Roof damage to a section of the building | Another section of the building | None Yet | Assistance is required for roof repairs |
| St.Ann | New Vision ECI | Roof Damaged | To be confirmed | None Yet | Assistance required |
| St. Ann | Fern Grove Basic | Roof gutter detached from roof | None | None Yet | Assistance is required for roof repairs |
| St. Ann | Free Hill Primary and Infant | The roof to one section is leaking, damaged windows, gutters displaced and the rails on corridor destroyed. | No alternate location yet identified | None Yet | Assistance is required in all areas. |
| Trelawny | Tender Care Day-care & Basic | Roof severly damaged. Damaged to structure | To be confirmed | None Yet | Assistance is required for all areas |
| Trelawny | Lowe River Basic | Roof completely destroyed | To be confirmed | None Yet | Assistance is required for all areas |
| | REGION 4 | | | |
| St. James | Norwood Basic | Entire roof gone from a section of the building. Principal’s office also damaged | No alternate location.May have to share space with undamaged section, if it can hold | Recovery required will need to seek outside assistance | Support required to rebuild |
| St. James | Farm Heights United Basic | One classroom roof totally damaged, books/documents damaged | No alternate location for school. May have to arrange spaces until roof is repaired | To be advised | Support required to rebuild |
| St. James | Cornwall Gardens Basic | Entire school roof gone, documents and resources damaged | No alternate location | Recovery required will need to seek outside assistance | Support required to rebuild |
| St. James | Cornwall Gardens Basic | Entire roof of school destroyed, classrooms got flooded, resources damaged | No alternate location | To be advised | |
| St. James | Norwood Basic | Lost roof to an entire section of the building | No alternate location/May have to share space with undamaged section of school | Recovery required will need to seek outside assistance | |
| St. James | Farm Heights United Basic | One classroom roof got damaged, documents and resources destroyed | No alternate location | To be advised | |
| St. James | DRB Grant Basic | Extensive damage to roof and classrooms. All learning resouces destroyed, extensive damge to children’s , teachers and office funiture. Office supplies stolen possobly while or after the hurricane. Extensive damge to windows and doors. Entire school flooded. | None identified | Meeting will be held with parents and staff to discuss same | Suppport required |
| Westmoreland | Cleveland Porter (Broughton) ECI | Roof destroyed for one classroom | Move class to the decked section | To repair the roof and reopen as soon as possible | Support required to rebuild |
| Westmoreland | Farquharson (Retreat) ECI | Roof destroyed | No alternate location | To repair the roof | Support required to rebuild |
| Westmoreland | Chantilly Garden ECI | Entire school has been demolished | No alternate location | Rebuild | Support required to rebuild |
| Westmoreland | Caring Hearts ECI | Roof damaged and a section of the office is twisted | No alternate location | Seeking assistance to repair the damages | Support required to repair roof and rebuild office |
| Westmoreland | Bunch of Stars ECI | A tree fell on the perimeter fence and fallen trees on the compound | Not applicable | Ongoing plan to remove debris and reopen as soon as possible | Support needed to cut up trees and remove |
| Westmoreland | Shrewsbury ECI | Roof destroyed, one classroom totally destroyed, furniture, resources and documents destroyed | No alternate location | Clean up has began | |
| Westmoreland | Eldin Washiington ECI | Roof totally destroyed | No alternate location | No funds to repair | Support required to rebuild |
| Westmoreland | Vision Plus ECI | Roof destroyed on the newly constructed area | No alternate location | Seeking assistance to repair the roof | |
| Westmoreland | Strawberry Primary and Infant | Roof destroyed, furniture, documents and resources damaged | No alternate location | Awaiting MOE | |
| Westmoreland | Frome ECI | | | | |
| Hanover | Haughton Grove Basic | Roofless ECI all furniture and resources were destroyed. | No alternate location yet identified | Recovery actions yet to be identified | |
| | REGION 5 | | | |
| Manchester | Chantilly Primary & Infant | 50% of the roof damaged. | To be discussed with the Principal | To be discussed with the Principal | Support required – estimated cost: $4 million |
| St. Elizabeth | Braes River Basic School | Roof completely lost. | To be discussed with the Principal | To be discussed with the Principal | Support require – estimated cost: $3 million |
| | REGION 6 | | | |
| St Catherine | City Mission Basic | A section of the roof is gone | None | | |
| | REGION 7 | | | |
| Clarendon | Love Lane Basic School | Light pole fell on section of the building damaging the roof. | none | Repair damaged section of the building | roofing materials |
| Clarendon | Nine Turns Basic | Damage to sections of the roof and ceiling. | None | Repair ceiling and replace gutter | ceiling materials and materials to install a gutter |
| Clarendon | Water Works ECI | Damage to sections of the roof and ceiling. Learning materials are damaged. | None | Repair ceiling and roof. Remake learning materials. | roofing materials and learning materials. |
| Clarendon | Colonel’s Ridge Basic | Damage to roof | None | Work in progress | Learning resources |